OVERVIEW OF SUPPORT : Japan supports governments of SADC countries to secure stable and affordable energy supply, through combining loan, grant aid and technical cooperation. This includes infrastructure development of power plant and transmission network, development of master plan and capacity development of related government institutions.
JICA
Botswana Office
Private Bag 00369
Gaborone, Botswana
MAIN CONTACT POINT:
Hoshino Akihiko
Resident Representative
Hoshino.Akihiko@jica.go.jp
+267-3912535
TA TO SADC ENERGY:
-
-
-
Project/Programme Start End Financial Support Type of Support DAC/CRS Code Partners/Co-financing
No 1 The project for introduction of clean energy by Solar Electricity generation system, Botswana 2011-01-01 2013-01-01 11,10M ¥ Grant Aid - -
No 2 Power System Development Advisor, Zambia 2012-01-01 2014-01-01 0,41M ¥ Technical cooperation - -
No 3 Increased Access to Electricity Services Project, Zambia 2009-01-01 0000-00-00 5,11M ¥ Loan - World Bank
No 4 Study For Power System Development Master Plan, Zambia 2008-01-01 2009-01-01 1,68M ¥ Technical cooperation - -
No 5 The Project for the Capacity Development for Rural Electrification, Zambia 2009-01-01 2012-01-01 3,00M€ Technical cooperation - -
No 6 Maputo Gas Fired Combined Cycle Power Plant Development Project Mozambique 2014-01-01 0000-00-00 172,69M ¥ Loan - -
No 7 The Project for Reinforcement of Transmission Network in Nacala Corridor Mozambique 2015-01-01 0000-00-00 2,012M ¥ Grant Aid - -
No 8 The Project for Reinforcement of Transmission and Distribution Facilities in Oyster Bay Substation, Tanzania 2008-01-01 2010-01-01 23.30M ¥ Grant Aid - -
No 9 The Project for Rehabilitation of Substation and Transmission Line in Kilimanjaro region, Tanzania 2011-01-01 2013-01-01 25,00M ¥ Grant Aid - -
No 10 The Project for the Reinforcement of Power Distribution in Zanzibar Island, Tanzania 2011-01-01 2013-01-01 30,00M ¥ Grant Aid - -
No 11 Iringa - Shinyanga Backbone Transmission Investment Project, Tanzania 2010-01-01 2015-01-01 60.48M ¥ Loan Aid - WB, EIB, Korea-Exim, AfDB
No 12 The Project for Capacity Development of Efficient Distribution and Transmission Systems, Tanzania 2009-01-01 2015-01-01 6.67M ¥ Technical cooperation - -
No 13 The Project of Rehabilitation of Substations and Construction of New Lines in Dar es Salaam, Tanzania 2014-01-01 2016-01-01 44.15M ¥ Grant Aid - -
No 14 The Project for Formulation of Power System Master Plan in Dar es Salaam and Review of the Power System Master Plan, Tanzania 2014-01-01 2016-12-31 3.2M ¥ Technical Cooperation - -
No 15 The Project for Review of the Natural Gas Utilization Master Plan, Tanzania 2014-01-01 2015-01-01 1.3M ¥ Technical Cooperation - -
No 16 Kenya-Tanzania Power Interconnection Project 2016-01-01 0000-00-00 118.47M ¥ Loan - AfdB
No 17 Preparatory Survey for the project for rehabilitation of INGA 2 hydropower station, DRC 2016-01-01 2017-01-01 1,00M ¥ Study - -
No 18 Data collection survey on gas utilization, South Africa 2015-01-01 2016-01-01 0,70M ¥ Study - -
No 19 Data collection survey on Southern African Power Pool 2015-01-01 2016-01-01 1,20M ¥ Study - SADC, SAPP

Please click to view completed projects

 

Expected outcome, indicators of project/programme in ICP Regional Energy Support:

-

Achievements, indicators of project/programme in ICP Regional Energy Support:

-

Outcomes/Results in ETG Action Plan, indicators: